Features | Concrete Submittal
From initial submission to final approval, Stancon Consultants manages your submittals and project documentation so you can focus on running the job. We keep your documents organized, track revisions, and help prevent paperwork from holding up your project.
We don't farm out our services!
We Only Work In The Industry!
We Have Experience In The Industry!
Industry experience
Exclusive industry focus
Submittal tracking
Project documentation
Missing or late submittals can delay schedules, hold up payments, and raise red flags with clients. When you're managing crews, coordinating pours, and keeping the job moving, documentation can become one more thing you don't have time for.
Stancon Consultants handles your submittal and project documentation process with structure and attention to detail. We keep documents accurate, formatted correctly, and moving ahead of deadlines — so you can focus on delivering quality work.
Stancon Consultants works exclusively with commercial and industrial concrete subcontractors. Concrete is our industry — not just another service.
With more than 20 years of hands-on industry experience, we bring the systems, structure, and practical insight your project needs.
From initial submission to approval, we manage revisions and maintain accurate logs to keep the paperwork organized.
Let us track your submissions, revisions, and approval status while you focus on managing the project.
Get dedicated project support without adding another documentation workload to your field team.
Bring structure to your submittals with accurate logs and organized project documentation.
Work with a team focused on commercial and industrial concrete — and the demands that come with it.
What We Do
Submittals aren't just documents to send and forget. Revisions, review comments, and approval status all need attention. We bring a structured process to your project documentation so important details don't get lost.
Project documentation organized and formatted for clear, professional submission to your project team.
Keep revisions and resubmissions organized so the right version reaches the right people.
Keep documentation moving ahead of deadlines and reduce avoidable paperwork delays.
Track every submittal from initial submission through review and approval, without losing sight of the next action.
Maintain clear records of submitted documents, review status, revisions, and approvals.
Coordinate the paperwork supporting your project, including lien release waivers with AIA pay application submittals.
Every job has its own requirements. Your contract documents and specifications define which materials, drawings, and supporting records need review. These are common examples of the documentation a commercial concrete project may require.
Mix design information and supporting supplier documentation may be required for review before a pour. Packages should be identified by the intended use and relevant specification section so the project team can connect the submission to the work.
Specifications may call for material certificates, test reports, or other supporting records. These documents need to be linked to the correct material or submission rather than left as disconnected attachments.
Manufacturer literature for curing compounds, sealers, admixtures, joint materials, and other specified products may form part of the submittal package. Clear product identification helps reviewers understand what is being proposed.
Where the contract requires them, reinforcing steel drawings, placement details, and related supplier documents need to be organized for submission. Drawing references and revision numbers help distinguish current information from superseded versions.
The specific documents included in Stancon's support are confirmed with you before work begins. Documentation coordination does not replace engineering, material testing, or the project team's technical review and approval.
Sending a package is only one part of the process. A review response may call for clarification, additional information, or a revised submission. Without a clear record, those next steps can disappear into email threads while the job keeps moving.

Keep the submission date, package reference, and review response connected. Record the reviewer's actual disposition so your team can distinguish a pending review from a package requiring changes.

Identify which documents need revision or additional supplier information. Keep comments with the relevant package so the person preparing the response has the context they need.

Maintain revision identifiers and resubmission dates alongside earlier responses. Keep the final reviewed version accessible and separate from superseded files.
The goal is a clear documentation trail: what was submitted, what came back, and what still needs attention. Approval decisions remain with the authorized project reviewers.
Send us your project plans, specifications, and submittal requirements. Include any existing log, review comments, and key dates so we can understand where the project stands. We review the documents and confirm your scope of support.
We prepare and format documentation, manage revisions, and maintain a clear submittal log. Project references and version information stay connected to each package, making pending submissions and outstanding responses easier to follow.
We track documentation from initial submission to approval, keeping the process organized as your project moves forward. Review responses and resubmissions remain part of the record, giving your team visibility into documentation that still needs attention.
Whether you're preparing for a new job or bringing order to an active one, a few key records help us understand the work and confirm the support you need.
Specifications may call for material certificates, test reports, or other supporting records. These documents need to be linked to the correct material or submission rather than left as disconnected attachments.
Share the relevant project documents and your contracted scope. These establish the context for required submittals and help identify which documentation belongs to your work.
Include the general contractor's submittal instructions, required forms, and any current register. If packages have already been submitted, share their review responses and outstanding comments too.
Have the relevant project team contacts and available supplier documentation ready. Knowing where information originates makes missing items and follow-up responsibilities easier to identify.
A concrete submittal is project documentation submitted for review against contract requirements before the related work or materials proceed. Depending on the project, this can include product data, mix designs, shop drawings, and supporting documentation. The project specifications determine what is required.
Stancon supports submittal and project documentation preparation, formatting, submission tracking, revision management, and accurate logs from initial submission to approval. Your project requirements and the agreed scope determine the specific documents included.
Our support is built for commercial and industrial concrete subcontractors who need an organized partner to manage project paperwork while their team focuses on field operations.
Yes. Stancon tracks submittal revisions and maintains accurate logs so document changes and review status remain organized throughout the process.
Stancon's project support also includes AIA pay application documentation, with the provision and formatting of lien release waivers with each AIA pay app submittal. Discuss your project with us to confirm the support you need.
Book a consultation or contact Stancon with your project plans, specifications, and submittal requirements. We will review the project with you and confirm the scope of support.